From: route@monster.com
Sent: Thursday, April 07, 2016 12:01 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Name: Eric D. Tribble
Title:
Technical Manager, Construction
Project Controls Contact:
Eric.D.Tribble@gmail.com Education: A.A.S., Technology
with an emphasis in Electrical Engineering Southwest
Tennessee Community College, Memphis, TN 2002
- 2003 Senior
Level - Electrical Engineering Technology University
of Memphis in Memphis, TN 2004
- 2005 IT / IMS: Primavera P5-P6v8.3,
Unifier, SAP, Lotus Notes, MS Project, CMMS, MS
Office
Certs/Degrees: A.A.S., Technology Degree with an
emphasis in Electrical Engineering, TWIC, ISTC Calhoun County, TX Affiliations: Member; Texas Freemason
1242 Unity Lodge Borger, TX
Various LinkedIn Professional Groups Summary of Credentials: Mr. Tribble’s 18 years of experience in the industrial construction
industry with primary focus in the Oil & Gas, Petro-Chemical, Chemical,
and Power Generation markets. Mr. Tribble is team oriented with emphasis on
solid communications across all work fronts to establish unification and
efficiency; along with systems accountability at both individual and team
levels, and has a genuine passion for learning and career growth. Mr. Tribble’s professional experience comprises of the previous 8
years devoted to supporting capital projects and turnarounds, in client roles
and contractor roles, as a project controls professional specializing in
planning and scheduling. Mr. Tribble is proficient in several areas of
planning and scheduling, including, but not limited to; the operating system
Primavera P5, P6v7 - v8.3 with user functionality, schedule development,
resource planning, and schedule integration, to support Critical Path Method
Scheduling, Quantity Surveying, and Earned Value Management, to effectively
analyze project and turnaround schedules, in an effort to generate adequate
reporting for management. Representative assignments include: IHI
E&C, International
Start Date: JUL2014 Houston,
TX
End Date: Current Technical
Manager of Construction at IHI E&C · Promoted creative thinking geared
towards the research and development of various work processes which embodied
the IHI E&C culture for operational and project execution excellence · Supported Strategic
Planning/Scheduling for Construction Business Operations · R&D of Swim Lanes, Flow Diagrams,
and Schedules for Construction Proposals and Projects · Responsible for Resource Loading
Schedules for Proposals · R&D of various Work Processes for
Construction Operations, Proposals, and Projects · Development and Integration of Construction
Execution Plans into Construction Schedules · Responsible for the Development of
Capital Projects Schedules · Responsible for Construction Resource
Planning/Scheduling · Responsible for the Development of
Construction Staffing Plans · Performed CPM Planning/Scheduling
Development and Analysis · Performed Quantity Surveying &
Measurement · R&D of EPC Workface Planning
integration with Primavera P6 and SP Materials, Foundation, and Construction · Performed Earned Value Management
& Control · Development of various reports for
Construction Operations, Proposals, and Projects CB&I
(Chicago Bridge &
Iron)
Start Date: OCT2013
Cartagena, Colombia
End Date: JUN2014 Senior
Scheduling Specialist at the Mega $6 Billion Cartagena, Colombia Reficar
Expansion Project · Joined the Project Controls Team as 1
of 16 Unit Project Schedulers for a Mega $6BB Refinery Expansion project · Block C Back-Up Lead
Planner/Scheduler · Assigned 3 units in Block C as the
Lead Planner/Scheduler · Performed duties as an Engineering,
Procurement, and Subcontractor Scheduler working with the EPC Scheduling Lead
· Successfully coordinated schedule
development with multiple Sub-Contractors to ensure WBS and Coding alignment
within the Master EPC Schedule and the Systems Completion Schedule, as well
as CB&I's Project Management Software PMCS · Imported Subcontractor schedules into
the CB&I Primavera Database to provide scheduling oversight · Analyzed Subcontractor schedules on a
weekly basis reporting to the CBI Planning/Scheduling Manager · Generated Manpower/Progress
Histograms and S-Curves for the PMT · Developed solid working relations
with the client PMT, CB&I PMT, as well as with the Subcontractor’s PMT on
site KBR
(Kellogg Brown & Root)
Start Date: MAR2013 Arlington,
TX
End Date: AUG2013 Principal
Specialist-Planning/Scheduling, at
Triumph Aerostructures · Successfully developed the Bid
Schedule and Budget utilizing Primavera P6 via Citrix Database for a $50MM
project · Developed P6 WBS Coding Structure · Worked with the client on WBS
Schedule Coding Alignment due to the complexity of the project · Created Project Activity Codes,
Calendars, Resource Codes and Calendars, etc. · Imported field plans in MS Excel into
P6 · Provided activity steps into the P6
schedule per client request · Resource loaded the schedule based
off of the field plan estimates · Created a resource loaded logically
driven CPM schedule to align with the client needs · Created Histograms and S-Curves to
provide the PMT with manpower estimation · Coordinated efforts to obtain a fully
integrated master project schedule · Acted as a Project Controls liaison
between contractor and client · Developed solid working relations
with the contractor and client PMT, as well as with the contractor Primavera
Global Support Team Swift
Technical Services
Start Date: JUN2012 Victoria,
TX
End Date: MAR2013 P6
Capital Project Engineering & Construction Scheduler, INVISTA-Victoria · Developed and maintained P6 schedules
for the capital projects and turnarounds ranging in cost from $5MM - $60MM · Employed as a client rep scheduler
for large, small, and turnarounds · Developed FEL and EPC schedules for
small and large cap projects · Provided oversight for all outsource
engineering firms’ FEL and EPC schedules · Managed approximately 35 P6 schedules
via Citrix Database for both large and small cap projects. · Assigned to Boilers Re-tube and SNCR
projects and turnarounds to provide client oversight and analysis conducting
logic/schedule reviews · Provided the client with executive
summary reports containing project S-Curves and Histograms for Earned Value
Management and Contractor progress · Successfully fully integrated all FEL
and EPC contractor schedules to create a master project schedule for the
client; as needed · Utilized SAP to P6 imports and
developed work order numbers for the capital projects group · Made certain that adequate hours were
introduced and emphasized for the start-up and commissioning activities. · Built solid relations with the cost
control engineers for schedule analysis and alignment for cost and change
management · Created solid working relationships
with INVISTA Central Engineering to ensure the scheduling processes and
procedures were upheld Jacobs
Engineering
Group
Start Date: JUL2011 Climax,
CO
End Date: FEB2012 Constructability
Coordinator – Commissioning Scheduler, Climax Molybdenum Restart,
Freeport-McMoRan Copper and Gold · Joined the Commissioning Management
Team working closely with the Manager of Commissioning Systems for
Freeport-McMoRan with a TIC of $500MM · Executed work as the commissioning
systems database facilitator/scheduler · Generated P&ID reviews against
the Instrument Index and Mechanical Equipment List to ensure consistent
information was delivered for the project · Coordinated the effort to verify all
vendors supplied and furnished with equipment instruments on site that the
contractor was unable to locate · Worked aside expediting and material
control personnel to obtain accurate information for deliverables · Consulted with the client concerning
engineering issues to create a successful path forward · Coordinated efforts to resolve issues
that were found during the constructability review · Responsible for managing and planning
a database to control all I&C checkout folders ensuring the correct
documentation was accounted for in the loop folders · Developed commissioning planning with
the use of project schedule · Successfully learned to use and
operate the Unifier (Skire) Management system to accurately obtain all information
regarding system turnover and commissioning activities; very critical for the
start-up process Foster
Design, Inc.
Start Date: JUN2009 Borger,
TX
End Date: DEC2010 System
Turnover Lead, GBR Project, ConocoPhillips Refinery, Borger, TX · Assigned as System Turnover lead
representing ConocoPhillips for a TIC of $300MM gasoline benzene reduction
project · Identified System Boundaries using
process flow sheets and mechanical flow sheets working closely with the
ConocoPhillips Operations Project Management Team for the System Turnover
effort · Coordinated with multiple contractors
to adequately convey the processes and procedures set in place for the
Gasoline Benzene Reduction Project system turnover to ConocoPhillips · Responsible for planning and managing
the system turnover process for the Gasoline Benzene Reduction Project
utilizing Microsoft Excel as a management and tracking tool gathering
information for client PSSR reviews · Successfully performed system walk
downs to ensure system completion by the turnaround contractors was being
reported accurately. Scheduled handover and commissioning activities by use
of Primavera (P6) software Foster
Design, Inc.
Start Date: JUN2008 Borger,
TX
End Date: JUN2009 Turnaround
Planner/Scheduler, GBR Project, ConocoPhillips Refinery · Joined the Capital Projects PMT Team
at the Borger Refinery representing ConocoPhillips for a TIC of $300MM
gasoline benzene reduction project · Performed work as a field planner,
turnaround planner/scheduler · Volunteered to study and learn
Primavera (P5 & P6) to support the Gasoline Benzene Reduction Project, in
order to help minimize project costs during the projects FEL phase. · Successfully planned and scheduled
the Unit 19.1 & 19.2 Spring 09 Turnaround for the GBR Project using
Microsoft Excel and Primavera, as a third party contractor · Worked closely with the Borger
Refinery Turnaround Group to ensure adequate information was identified in
the Project Schedule · Developed scheduling activities for
all disciplines, generated relationship logic, and resource leveling
utilizing Primavera P6 · Conducted planning and scheduling
meetings to ensure streamline communication between all contractors and
refinery personnel to support schedule alignment The
Shaw
Group
Start Date: FEB2006 Pasadena,
TX
End Date: FEB2007 Field
Engineer – System Turnover, Valero ULSD Project, Valero Refinery · Constructed hydro-test packages for
the engineering department with the use of piping specialty programs,
engineering drawings and specifications for a TIC project of $350MM project · Responsible for managing and
maintaining hydro-test packages electronically and physically for the
engineering department · Formulated spreadsheets and
flowcharts to coordinate test package flow for those involved · Supervised and performed engineering
walk downs to ensure the quality of construction was in compliance ·
Reviewed and
walked existing RFI’s to determine completion and if needed · Managed client punch-item issues to
make certain they were completed and compliant · Consulted with the client and quality
control in order to obtain and convey adequate information concerning
punch-items, test package construction, test procedures, etc. · Responsible for supervising,
planning, and coordinating work for hydro-test packages and system walk-downs · Successfully managed an eight to
twelve person walk down team for the hydro test process to gear up for system
turnover to the client TRS
Staffing
Start Date: DEC2005 Lake Charles,
LA
End Date: FEB2006 QC
Inspector, Hurricane Rita Relief, Chenault Air Force Base · Joined the TRS/FEMA team in order to
help with Hurricane Rita relief · Performed site assessments to obtain
accurate information for FEMA temporary housing placement · Supervised construction crews to
ensure all federal, state, city, and Parrish requirements were met · Performed QC inspections for FEMA · Attended government compliance
meetings to gather information as needed Fluor
Enterprises
Start Date: JUN2005 Billings,
MT
End Date: DEC2005 Instrument
Supervisor, ConocoPhillips ULSD Project · Joined the I&E Department as an
Instrument Foreman for a $350MM ULSD project · Supervised fabrication and
installation of process tubing, instrument air, steam tracing, and
instruments · Planned, organized, and supervised
work for a ten to fifteen person crew · Recorded and tracked progress daily
as needed · Supervised all testing procedures
associated with instrumentation · Made sure all work performed was in
compliance with safety requirements Mid-South
Maintenance
Start Date: AUG2002 Memphis,
TN
End Date: MAY2005 Pipe
& Instrument Supervisor, Crompton-Witco Chemical, Memphis, TN · Performed duties concerning all
facets of pipe/instrument field installation issues · Reviewed pipe engineering drawings
and specifications for construction in order to meet client compliance issues · Determined field routing changes of
piping and process tubing to the client’s approval · Supervised instrument crews during all
phases of construction · Performed maintenance on steam
systems, pneumatics, mechanical equipment, etc. · Compiled various reports and
estimates for rework, installation, and demolition · Worked plant maintenance while
attending the University of Memphis in Memphis, TN Employment History:
IHI
E&C
2014 - Current Technical Manager, Construction Project Controls CB&I
2013 - 2014 P6 Senior Scheduling
Specialist Kellogg Brown &
Root
2013 - 2013 P6 Planner/Scheduler Swift Technical
Services
2012 - 2013 P6 EPC Planner/Scheduler Jacobs Engineering
Group Inc. 2011 -
2012 Constructability Coordinator – Commissioning Scheduler Foster Design, Inc
2008 - 2011 P5 Turnaround Planner/Scheduler Systems Turnover Lead The Shaw Group
2006 - 2008 Field Engineer TRS
2006 - 2006 QC Inspector Fluor
Enterprises
2005 - 2006 Instrument Supervisor Mid-South
Maintenance
2002 - 2005 Maintenance Mechanic Pipe & Instrument Supervisor Various
Contractors
1994 - 2002 Instrument Fitter Pipe Helper |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
|